CPCB revises OCEMS Guidelines 2018.

Aug 30, 2018 | by TeamLease RegTech Legal Research Team

A |  A

Free Legal updates for the week 00


EHS Compliance

Central Pollution Control Board (CPCB) vide notification dated August,29,2018 has revised the Guidelines for Continuous Emission Monitoring System 2018.

1.       Background

a.       Installation of online emission quality monitoring system in 17 categories of highly polluting industries and in Common Hazardous waste and Biomedical waste incinerators for measurement of the parameters, Particulate Matter, NH3 (Ammonia), SO2 (Sulphur Dioxide), NOX (Oxides of Nitrogen) and other sector specific parameters, not later than by March 31, 2015 and transmission of online data so generated simultaneously to SPCB/PCC and CPCB as well. The deadline was later extended to June 31, 2015.

b.       Installation of surveillance system with industrial grade IP (Internet Protocol) cameras having PAN, Tilt, Zoom (PTZ) with leased line real time connection for data streaming and transmission of the same in case of industries claiming Zero Liquid Discharge (ZLD); and

c.       Ensure regular maintenance and operation of the online system with tamper proof mechanism having facilities for online calibration (onsite/ offsite; Remote).

 

2.      Objectives of CEMS

The Continuous Emission Monitoring (CEM) System comprises of all the equipment necessary to determine the concentration of gaseous emission and/or particulate matter and/or emission rate using analytical measurements and a computer program to provide results in units of the applicable emission limits or standards. The data generated is gathered either through analog outputs to a recording system or send directly to a DAS (Data Acquisition System) for storage and onward transmission. Data Acquisition System includes special modules for data validation and further transmission to Central severs located at SPCB/ CPCB through a cloud server compatible to specific types of analyzers. It is important to have properly engineered CEM systems.

 

Detail revised guidelines are available on following link.

 

URL-http://cpcb.nic.in/upload/thrust-area/revised-ocems-guidelines-29.08.2018.pdf


Bookmark

Related Updates



Alternate Text

Get updates on the go on RegUpdate Mobile App.

✦ NEW  ·  AI ASSISTANT