The Government of Madhya Pradesh, on June 18, 2026, amended the Levy of Fees for Inspection and Approval of Electrical Installation (Madhya Pradesh) Rules, 2017 under the powers conferred by the Electricity Act, 2003.
The amendment substitutes Rule 3 to clarify that no inspection fee shall be payable for medium-pressure equipment installed within high-pressure and very high-pressure installations. However, inspection fees will continue to be levied on individual equipment such as boosters, capacitor banks, generators, reactors, inverters, converters, motors, transformers, and breakers/panels installed in high-pressure and very high-pressure installations, according to the rates prescribed in Part-I of the Schedule and based on equipment capacity.
Further, Rule 11 has been substituted to provide that inspection fees for generators and transformers installed in cinema installations shall be charged separately at the rates specified under Heading (2) of Part-I of the Schedule.
[Notification No. F-05-07/2019/XIII]